Current incidents
Network issues are being observed in the ru-7 pool. Engineers are already aware of this problem and are working to resolve it.
Currently, we are seeing an increased intensity of calls to S3 service in the regions ru-1, ru-3, ru-6, ru-7, gis-1, kz-1, uz-2.
In this regard, it is possible to increase the response time and temporarily decrease the speed during operations of reading and writing objects. Data availability is maintained in full.
Work on load balancing is already underway on our part.
We apologize for any inconvenience.
Information notices
A critical vulnerability, CVE-2026-110264, has been identified in GitLab Community Edition (CE) and Enterprise Edition (EE). This vulnerability is related to the processing of specially crafted regular expressions.
Under certain conditions, exploiting this vulnerability allows an unauthenticated remote attacker to execute arbitrary code on the GitLab server.
The vulnerability affects GitLab CE/EE. The minimum patched versions are 19.5.1, 19.4.3, 19.3.6, 19.2.9, 19.1.9, 19.0.10, and...
Two critical vulnerabilities have been discovered in the PHP interpreter core, with CVSS 4.0 scores of 9.2/10, identified as CVE-2026-109618 and CVE-2026-109619. They are collectively known as PHP2Shell.
Exploiting these vulnerabilities can lead to remote code execution (RCE), unauthorized access to information, system malfunctions, and the use of your server to launch cyberattacks.
All PHP versions below 8.2.35, 8.3.36, 8.4.27, and 8.5.12 are affected. This includes sites, applications,...
If you have technical questions, a wide range of topics is covered in the documentation.
If you need help from a specialist, please submit a ticket. However, responses may currently take longer than usual.
Scheduled maintenances
Scheduled maintenance on the network equipment in the ru-3 pool is planned for November 5, 2026, from 14:30 to 20:00. During the maintenance, redundancy for the Internet network and the global router’s private networks is expected to be reduced to N+0.
No interruptions to communications services are expected.
Work to upgrade the power supply system is scheduled at the Tsvetochnaya-2 site on November 10, 2026, starting at 10:00 (UTC+3) and continuing until completion. One power feed will be switched off.
During the work, equipment with two power supplies will be powered by the second feed. Equipment with a single power supply will be switched to the active feed if the rack has an automatic transfer switch (ATS).
No server shutdowns are planned during the work.