On November 24 and 25, 2026, between 08:00 and 20:00 (UTC+3), one of the power feeds to the racks housing your leased or colocated equipment will be switched off as part of scheduled maintenance. The other power feed will remain operational as normal, so power redundancy will be temporarily reduced.
The server equipment is not scheduled to be shut down.
On 24.11.2026 at the SPB-2 facility, work is scheduled from 10:00 until completion (UTC+3) to upgrade the power supply scheme by disconnecting one power feed.
During the maintenance, the power supply redundancy level is expected to be reduced to N+0.
No equipment downtime is expected.
On 25.11.2026 at the Tsvetochnaya-2 facility, work is scheduled from 10:00 until completion (UTC+3) to upgrade the power supply scheme by disconnecting one power feed.
During the maintenance, the power supply redundancy level is expected to be reduced to N+0.
No equipment downtime is expected.