All systems operational
Don't agree with what's reported here? Contact us at support@servercore.com.
Bare metal Operational
Pools Operational
TAS-1 Operational
TAS-2 Operational
ALM-1 Operational
NBO-1 Operational
Services Operational
Dedicated Servers Operational
Network Operational
Cloud Platform Operational
Pools Operational
uz-1a Operational
uz-2a Operational
kz-1a Operational
ke-1a Operational
Services Operational
Cloud servers Operational
Network Volumes Operational
Images Operational
Backups Operational
Load Balancer Operational
Network Operational
Managed Kubernetes Operational
Managed Databases Operational
File Storage Operational
Network services Operational
Global router (L3VPN) Operational
Data centers Operational
Tashkent, Uzbekistan Operational
Almaty, Kazakhstan Operational
Nairobi, Kenya Operational
Infrastructure Operational
Electricity Operational
Conditioning Operational
Redundancy Operational
Network Operational
Interfaces Operational
Website Operational
Control Panel Operational
Billing Operational
API Operational
Mirror Operational
NTP Operational
Mail Operational
External network Operational
DNS Operational
External network Operational

Scheduled maintenances


Notification Planned works on electrical equipment in data center Dubrovka-2 29.07.24 from 2024-07-29 09:30 MSK to 2024-07-29 18:00 MSK
[Scheduled]

In the data center “Dubrovka-2” will be carried out scheduled work to upgrade electrical equipment. 29.07.24g. in the period from 06:30 to 10:00 (UTC+0) will be disconnected one power supply input, in the period from 11:00 to 15:00 (UTC+0) will be disconnected input 2, which will entail a reduction in the level of redundancy.

The work of servers with one power supply unit will not be affected by these works, if the server has two power supplies, one of them will be disconnected, at the same...

Notification Planned works on electrical equipment in data center Dubrovka-2 30.07.24 from 2024-07-30 09:30 MSK to 2024-07-30 18:00 MSK
[Scheduled]

In the data center “Dubrovka-2” will be carried out scheduled work to upgrade electrical equipment.
30.07.24g. in the period from 06:30 to 10:00 (UTC+0) will be disconnected one power supply input, in the period from 11:00 to 15:00 (UTC+0) will be disconnected input 2, which will entail a reduction in the level of redundancy.

The work of servers with one power supply unit will not be affected by these works, if the server has two power supplies, one of them will be disconnected, at the...

Scheduled maintenance Scheduled work SPB-3 from 2024-07-30 09:30 MSK to 2024-07-30 18:00 MSK
[Scheduled]

07/30/24 from 06:30 to 15:00 (GMT) it is planned to carry out routine maintenance work on equipment at the 10 kV distribution substation. In this regard, power supply redundancy in the SPB-3 location will be reduced, equipment shutdown is not expected.

Notification Planned works on electrical equipment in data center Dubrovka-2 31.07.24 from 2024-07-31 09:30 MSK to 2024-07-31 18:00 MSK
[Scheduled]

In the data center “Dubrovka-2” will be carried out scheduled work to upgrade electrical equipment. 31.07.24g. in the period from 06:30 to 10:00 (UTC+0) will be disconnected one power supply input, in the period from 11:00 to 15:00 (UTC+0) will be disconnected input 2, which will entail a reduction in the level of redundancy.

The work of servers with one power supply unit will not be affected by these works, if the server has two power supplies, one of them will be disconnected, at the same...

Scheduled maintenance Planned works on electrical equipment in data center Dubrovka-2, 08/01/2024 from 2024-08-01 06:30 MSK to 2024-08-01 15:00 MSK
[Scheduled]

In the Dubrovka-2 data center, planned work will be carried out to modernize electrical equipment. 08/01/24 in the period from 06:30 to 10:00 one power supply input will be turned off, in the period from 11:00 to 15:00 input 2 will be turned off, which will entail a decrease in the level of redundancy, time is indicated GMT.

These works will not affect the operation of servers with one power supply. If the server has two power supplies, then one of them will be turned off, but the equipment...

Scheduled maintenance Planned works on electrical equipment in data center Dubrovka-2, 08/02/2024 from 2024-08-02 06:30 MSK to 2024-08-02 15:00 MSK
[Scheduled]

In the Dubrovka-2 data center, planned work will be carried out to modernize electrical equipment. 08/02/24 in the period from 06:30 to 10:00 one power supply input will be turned off, in the period from 11:00 to 15:00 input 2 will be turned off, which will entail a decrease in the level of redundancy, time is indicated GMT.

These works will not affect the operation of servers with one power supply. If the server has two power supplies, then one of them will be turned off, but the equipment...

% Uptime
90 days ago Today
Incident & maintenance history
This page is automatically updated every 60 seconds