Scheduled maintenance work "Global Router", SPB-2, ru-3 from 2025-07-11 00:00 EAT to 2025-07-11 06:00 EAT
Scheduled maintenance
Bare metal
Pools
SPB-2
Cloud Platform
Pools
ru-3a
ru-3b
2025-07-11 00:00 EAT
· 6 hours
Updates
Scheduled
July 7, 2025 · 16:58 EAT
It is planned to carry out scheduled maintenance work to update the network equipment servicing the L3VPN network segment in the SPB-2 dedicated server location, the ru-3 cloud platform region.
The work will be carried out on 11.07.2025 from 00:00 to 06:00 (GMT+3).
Expected impact:
- reducing the gateway redundancy level for the entire duration of the work to N+0 for L3VPN networks in the specified locations/regions;
- there will be 2 breaks, up to 10 seconds each. For all types of networks;
- one of the BGP sessions used will be extinguished for the entire duration of the work.