Planned work on upgrading the SPB-3 power supply from 2024-05-13 10:00 EAT to 2024-05-13 18:00 EAT
Scheduled maintenance
Bare metal
Pools
SPB-3
Data centers
Infrastructure
Electricity
2024-05-13 10:00 EAT
· 8 hours, 1 second
Updates
Scheduled
April 26, 2024 · 11:12 EAT
13.05.24 from 10:00 to 18:00 GMT/UTC+3 in the Dubrovka 3 data center in the racks: XK-8492, RK-5218, RK-0788, MY-1086, scheduled work will be carried out aimed at upgrading the power supply. In this regard, the redundancy of the power supply will be reduced.
Equipment shutdown is not expected.
← Back