Planned work on upgrading the network infrastructure of the ALM-1 location from 2024-05-23 23:00 MSK to 2024-05-24 04:00 MSK
Notification
Bare metal
Pools
ALM-1
2024-05-23 23:00 MSK
· 5 hours
Updates
Scheduled
May 20, 2024 · 11:37 MSK
In the period from 05/23/2024 23:00 to 05/24/2024 04:00 (GMT+3), work will be carried out to optimize the network load on the switches at the ALM-1 location. During the technical work, an interruption in the operation of the external network is expected to last up to 5 minutes.
If your equipment is affected by these operations, you will receive an additional notification in the notification center in the control panel.
← Back