Scheduled work SPB-3 from 2024-07-30 09:30 EAT to 2024-07-30 18:00 EAT
Scheduled maintenance
Bare metal
Pools
Cloud Platform
Pools
2024-07-30 09:30 EAT
· 8 hours, 30 minutes
Updates
Scheduled
July 25, 2024 · 02:47 EAT
07/30/24 from 06:30 to 15:00 (GMT) it is planned to carry out routine maintenance work on equipment at the 10 kV distribution substation. In this regard, power supply redundancy in the SPB-3 location will be reduced, equipment shutdown is not expected.
← Back