Scheduled maintenance work at the Tsvetochnaya 2 data center, 11/06/2024 from 2024-11-06 06:30 MSK to 2024-11-06 15:00 MSK
Notification
Bare metal
Pools
Services
Dedicated Servers
2024-11-06 06:30 MSK
· 8 hours, 30 minutes
Updates
Scheduled
November 1, 2024 · 17:11 MSK
In the period from 06.11.2024 06:30 to 06.11.2024 15:00 (GMT0), the emergency power supply will be disconnected at one of the inputs of some server racks.
Expected impact - reduction of the redundancy level to N+0.
During the scheduled maintenance, both inputs will be available, one will function without an emergency power supply.
These works will not affect the operation of servers with one power supply; if the server has two power supplies, one of them can be disconnected, but the equipment will continue to operate.