Scheduled works on network equipment in location SPB-2/ru-3/SPB-DR-1 from 2025-03-12 00:00 EAT to 2025-03-12 03:00 EAT

Scheduled maintenance Bare metal Pools Cloud Platform Pools
2025-03-12 00:00 EAT · 3 hours

Updates

Resolved

This maintenance has been concluded as planned.

March 12, 2025 · 03:00 EAT
Started

This maintenance is now starting as planned.

March 12, 2025 · 00:00 EAT
Scheduled

12.03.2025 00:00-03:00 Moscow time scheduled works will be performed on network equipment in location SPB-2/ru-3/SPB-DR-1.
As part of the scheduled work, the gateway redundancy level is expected to be reduced to N+0 for L3VPN networks in the specified locations/regions.

March 6, 2025 · 15:40 EAT

← Back