(Network) Scheduled work on the control layer of the global router, uz-1 from 2025-05-15 22:30 EAT to 2025-05-16 00:30 EAT

Scheduled maintenance Cloud Platform Pools uz-1a uz-2a Network services Global router (L3VPN)
2025-05-15 22:30 EAT · 2 hours

Updates

Resolved

This maintenance has been concluded as planned.

May 16, 2025 · 00:30 EAT
Started

This maintenance is now starting as planned.

May 15, 2025 · 22:30 EAT
Scheduled

Work is planned on the global router networks (L3VPN), in the UZ-1 location. The work affects the control layer. The time range of the work is 22:30 - 00:30 (UTC+3).
No interruptions in connectivity are expected during the work.

During the work, it is not recommended to:

  • create/delete l3vpn networks, subnets and connect them to ports;
  • create/change the size of virtual machines connected to networks in the global router.
May 14, 2025 · 13:08 EAT

← Back