2025-12-10 23:00 EAT
· 59 minutes
Updates
Scheduled
December 8, 2025 · 12:45 EAT
To enhance the reliability of external connectivity, on December 11, 2025, from 01:00 to 01:59 (UTC+5), a change in the uplink configuration with TAS-IX in the TAS-1/UZ-1 pools has been planned. During the works, connectivity to external resources will be provided through a backup channel with UZ-IX or through other uplinks.
There may be difficulties accessing resources whose operation is only ensured within the TAS-IX framework, lasting up to 10 minutes.