Electrical Equipment Maintenance at MSK-7 from 2026-10-19 09:00 EAT to 2026-10-19 20:00 EAT

Scheduled maintenance Bare metal Pools MSK-7 Data centers Infrastructure Electricity
2026-10-19 09:00 EAT · 11 hours

Updates

Scheduled

Scheduled maintenance will be carried out at the MSK-7 location on October 19, 2026, from 09:00 to 20:00 (UTC+3). As a result, power redundancy in the server racks will be reduced.

Servers with a single power supply will not be affected. For servers with two power supplies, one unit will be switched off, and the equipment will continue to operate on the other.

We apologize for any inconvenience.

October 12, 2026 · 12:45 EAT

← Back