Planned maintenance at the Tsvetochnaya-2 site from 2026-11-12 10:00 EAT to 2026-11-12 20:00 EAT
Scheduled maintenance
Bare metal
Pools
SPB-2
Services
Dedicated Servers
Data centers
Infrastructure
Electricity
2026-11-12 10:00 EAT
· 10 hours
Updates
Scheduled
November 3, 2026 · 15:35 EAT
Work to upgrade the power supply system is scheduled at the Tsvetochnaya-2 site on November 12, 2026, starting at 10:00 (UTC+3) and continuing until completion. One power feed will be switched off.
During the work, equipment with two power supplies will be powered by the second feed. Equipment with a single power supply will be switched to the active feed if the rack has an automatic transfer switch (ATS).
No server shutdowns are planned during the work.